Why choose us? 

Knowledgable

We have a combined 30 years of experience in AD.  You name it, we’ve seen it, and probably fixed it.

Agile

No bureaucracy here. We move quickly and painlessly through our projects.  We’re nimble and can change direction swiftly when needed.

Results-focussed

We will agree your goals and milestones ahead of a project and remain focused on achieving them as quickly and professionally as possible. 

What to expect from working with us

Our core team has 30 years+combined experience working on Anaerobic Digestion facilities around the UK. 

When you choose to work with us, you choose a practical & knowledgable team that will get to the bottom of your issues with no fuss. 

We use a logical, investigative approach to work out what needs doing and we get it done.  

You can expect a facts based, no BS approach; we will ask direct questions and tackle difficult issues when needed, but always with the good of your project at heart. 

We are a fresh, agile team that don’t believe in wading around in spreadsheets and reports for the sake of it.  We stay focussed on your results and take the path of least resistance to get you there. 

We are not the stiff suited consultants that will write you a lengthy report and leave you to figure out how to implement the change.  If needed we’ll get involved with your operations team, or even take over the whole management of your plant if that’s what you’d like.  

 

 

ONM-energy-anaerobic digestion consultants Ricky Malin and Kyrone Dodd stand in front of digestion tank

“We really appreciated the team’s common sense, no BS attitude.”

“They came in, got hands-on with every inch of the plant, and quickly identified things many others hadn’t. They maintained a “we cannot hide from the problems” approach without the need for flashy spreadsheets, tech. or gimmicks. And they didn’t shy away from tackling difficult issues head-on.  Their knowledge, practical approach, and ability to find and fix our problems was second to none. I wouldn’t hesitate to recommend them to others.”

Adrian Williams. Willen Biogas.

Case study – Pipers Farm

Pipers Farm operates a 10,000 tonne input, 500 kWe output agricultural AD plant in Kent.  They suffered an urgent compliance issue that stopped them operating. Read on for a detailed case study about how we helped them overcome the issue and get back to a stronger power production than ever.  

Case Study – Fernbrook Bio

Fernbrook Bio is a 1.5 MWe output food waste AD facility in Northamptonshire.  They were in need of process and performance optimisation, having suffered legacy issues for some time.  Read on for a detailed case study about how we helped them overcome these issues to achieve more stability and the yields they had been striving for.

Case study – Willen Biogas

Willen Biogas is a 1.5 MWe output food waste AD facility in North London.  They were baffled by their lack of yields.  Read on for a detailed case study about how we helped them achieve the yields and profitability they had budgeted for.